History of Establishment and Development

2017

35 Year Anniversary

banner-002

Licogi 14 35 Years Establishment and  Development (11/02/1982 – 11/02/2017) banner-002

Licogi 14 35 Years Establishment and  Development (11/02/1982 – 11/02/2017) 

xem thêm
2002

Period 2002 - 2006

This is the era of fierce competition on employment, investment in capital construction more difficult, state investment navigation key focus. Integration trend of international economy increasingly vibrant and Vietnam has officially become a WTO member.

LICOGI 14 actively expand the construction and installation markets for transportation, construction, commercial business, construction industry:

–  Leveling Yen Binh Cement Bulkheads – Yen Bai more than 2.1 million m3 of volume.

– Participate in marine construction Lan envelope 8 by the General LICOGI column as an investor, urban roads in Muong Khuong district  – Lao Cai, Medical Center in Cam Khe – Phu Tho, My Duc – Ha Tay …

* In the area of investment:
1. Project Minh Phuong Urban- Vietnam Tri City – Phu Tho province

Company was assigned by Phu Tho provincial People’s Committee, LICOGI Corporation as investor Minh Phuong new urban area – Viet Tri with 48,6ha scale, total investment of the first phase VND 300 billion to build the entire infrastructure. Phase II of the construction of commercial service facilities, urban housing. The people in the project area sympathy and support, the right of compensation policies and support, with the order implementing the provisions of the law, is the level of industry, local authorities, all conditions help, the effort of the investors. To date the basic project clearance compensation of 90% of the area. Section under construction infrastructure (roads, stormwater drainage, sewage, water supply, lighting ….)28-compressed

This is the downtown urban, urban type 2 – City roots festival, technical infrastructure works in sync with the social welfare, convenient transportation connections with the National Highway 2,  Hung Vuong Avenue is mounted between the industrial urban hydrology, the textile industry, tourism Hung Temple. Create an appearance of architecture, landscape and environmental improvement to meet the needs of residential land, housing for all subjects in all parts of the country in the city of festivals of ethnic origin.

2 Hydropower project in Bac Ha – Lao Cai province, LICOGI14 is the one of the main construction works in the project

–  construction on Chay River (the second ladder Thac Ba), is the work of planning Vietnam electricity development prospects 2001-2010 taking into account 2020 by Decision 40/2003 the Government of prime Minister.

– 170 million m3 reservoir

– Dam height 75 m

– 436 m crest length

– 183 m high dam crest

– Installed capacity 90 MW (2 units x 45 MW)

– Hoa national grid annually 370 million KWH.

– Total investment of nearly 1,850 billion VND today

– Source equity, loan Vietnam Bank for Agriculture and Rural Development, Vietnam Development Bank

– Due Corporation Investor LICOGI made in the form of investment – Operate – Own (BOO).

LICOGI 14 have been determined to ensure the progress of construction, the quality of the units of General Electric Co. LICOGI strive to develop by the end of 2009.

thuy-dien-bac-ha

Bac Ha Hydropower

3. The new residential project in Phu Tho town – Phu Tho province

Phu Tho Town Center formerly Phu Tho province, has a history of over 100 years, the cultural center, economic and submit to political, social, transport facilitation on railway, road, waterway near future a grade 3.

4. Project construction of houses for sale, Hoang Van Thu Ward – Hoang Mai – Hanoi

Key indicators: (The master plan ground facility Hanoi Architectural planning approval).

– Drawings 08/18/2004

– Document 1694 / QHKT – P1 dated 18.08.2004

– Land area: 21.023m2

5. LICOGI 14 fuel  Station

LICOGI 14 to be investor with over 3,600 m2 in area fell 3 positions Hung Vuong Street, Nguyen Tat Thanh Tri bowel Vietnam.

– Currently trading gas, oil, grease types.

– Prepare first warranty service repair, auto dealers.
– Sales of 1 January 150 170 m3 of petrol / 1 month.

2011-09-13-09-28-xang_dau

 

 

This is the era of fierce competition on employment, investment in capital construction more difficult, state investment navigation key focus. Integration trend of international economy increasingly vibrant and Vietnam has officially become a WTO member.

LICOGI 14 actively expand the construction and installation markets for transportation, construction, commercial business, construction industry:

–  Leveling Yen Binh Cement Bulkheads – Yen Bai more than 2.1 million m3 of volume.

– Participate in marine construction Lan envelope 8 by the General LICOGI column as an investor, urban roads in Muong Khuong district  – Lao Cai, Medical Center in Cam Khe – Phu Tho, My Duc – Ha Tay …

* In the area of investment:
1. Project Minh Phuong Urban- Vietnam Tri City – Phu Tho province

Company was assigned by Phu Tho provincial People’s Committee, LICOGI Corporation as investor Minh Phuong new urban area – Viet Tri with 48,6ha scale, total investment of the first phase VND 300 billion to build the entire infrastructure. Phase II of the construction of commercial service facilities, urban housing. The people in the project area sympathy and support, the right of compensation policies and support, with the order implementing the provisions of the law, is the level of industry, local authorities, all conditions help, the effort of the investors. To date the basic project clearance compensation of 90% of the area. Section under construction infrastructure (roads, stormwater drainage, sewage, water supply, lighting ….)28-compressed

This is the downtown urban, urban type 2 – City roots festival, technical infrastructure works in sync with the social welfare, convenient transportation connections with the National Highway 2,  Hung Vuong Avenue is mounted between the industrial urban hydrology, the textile industry, tourism Hung Temple. Create an appearance of architecture, landscape and environmental improvement to meet the needs of residential land, housing for all subjects in all parts of the country in the city of festivals of ethnic origin.

2 Hydropower project in Bac Ha – Lao Cai province, LICOGI14 is the one of the main construction works in the project

–  construction on Chay River (the second ladder Thac Ba), is the work of planning Vietnam electricity development prospects 2001-2010 taking into account 2020 by Decision 40/2003 the Government of prime Minister.

– 170 million m3 reservoir

– Dam height 75 m

– 436 m crest length

– 183 m high dam crest

– Installed capacity 90 MW (2 units x 45 MW)

– Hoa national grid annually 370 million KWH.

– Total investment of nearly 1,850 billion VND today

– Source equity, loan Vietnam Bank for Agriculture and Rural Development, Vietnam Development Bank

– Due Corporation Investor LICOGI made in the form of investment – Operate – Own (BOO).

LICOGI 14 have been determined to ensure the progress of construction, the quality of the units of General Electric Co. LICOGI strive to develop by the end of 2009.

thuy-dien-bac-ha

Bac Ha Hydropower

3. The new residential project in Phu Tho town – Phu Tho province

Phu Tho Town Center formerly Phu Tho province, has a history of over 100 years, the cultural center, economic and submit to political, social, transport facilitation on railway, road, waterway near future a grade 3.

4. Project construction of houses for sale, Hoang Van Thu Ward – Hoang Mai – Hanoi

Key indicators: (The master plan ground facility Hanoi Architectural planning approval).

– Drawings 08/18/2004

– Document 1694 / QHKT – P1 dated 18.08.2004

– Land area: 21.023m2

5. LICOGI 14 fuel  Station

LICOGI 14 to be investor with over 3,600 m2 in area fell 3 positions Hung Vuong Street, Nguyen Tat Thanh Tri bowel Vietnam.

– Currently trading gas, oil, grease types.

– Prepare first warranty service repair, auto dealers.
– Sales of 1 January 150 170 m3 of petrol / 1 month.

2011-09-13-09-28-xang_dau

 

 

xem thêm
1992

Period 1992 - 2002

fter completing basic tasks plants in Lao Cai Apatite. Dated 20.07.1992 the Ministry of Construction has decided the 358-BXD-TCLĐ moved company headquarters from Bao Thang Vietnam Tri city, Phu Tho Province and renamed the company as Installation and Mechanized Construction Company No 14.

tru-so-cong-ty

In this stage, the Company had to continue to find work, expanding the market to maintain steady work and promoted the traditional equipment of mechanical construction and spread over the whole country.

– In the South: Thac Mo Hydropower Project is also the country’s key, scraper tires Hero team was still the same powerful forces 15 bulldozers, excavators moving more than 1 thousand kilometers from Lao Cai to Thac Mo. In this workplace, this was requiring high technical requirements, schedule, only using 2/3 time of a year on construction, the remaining time is the rainy season, but the Company has determined with the units in total LICOGI group to finished in good progress and the quality of works.

– In the North: The powerfulmotorbikes forces, equipment was taken down in Quang Ninh construction to exploited to cover coal mine coal mining in Mao Khe, Uong Bi, Cam Pha. Annually, blasting, loading and shipping contact from 1: 1.5 million m3 of earth and rock meet export demand for coal.

– With gantry synchronization modern equipment, beside the building hydroelectric, thermoelectric consecutively, other works are involved in the construction foundation treatment, technical infrastructure standards like:

+ Background leveling, using the infrastructure of EPZs of Soc Son Noi Bai.

+ Piles T1 terminal Noi Bai International Airport.

+ Works piling Tiger Brewery Thuong Tin, Ha Tay

+ Construction of piling in paragraph Thuong Tin Highway 1B turn Ha Tay Bridge.

+ Construction of rock drilling and blasting, loading shovel and delivery in Cai Lan noodle factory.

+ Handling piling pumping stations in Yen So lake – Hanoi

+ Join rock drilling, unloading of Huangshi cement factory expansion.

+ Join transporting highway embankment Thang Long Noi Bai.

+ Join construction leveling Pha Lai Thermal Power Plant 2.

Since 1988 ¸ 2002 beside the building, leveling the Company boldly to invest in construction of roads, irrigation, civil engineering namely:

Join Venture CENCO1-KUMAGAI -LICOGI 14 to built 54 kilometers of highway 1A Hanoi – Lang Son, from Bac Giang to Lang Son from ADB sponsor; worth 42 billion, the Company identified key project is the construction of traffic works, there are strict requirements on technical standards, the progress and the quality and volume of 2.1 million m3 of rock on , is the foundation material and Base Subase ASTO American standards, by foreign consultants to supervise and route traffic to ensure online travel circuit Lang Son border 54km, 6,000 meters long sewer amount, the company has homemade casting lines created by means of vibration sewer diameter 150, 750 ¸ 2000; good quality through experiments were approved by foreign consultants. Buildings were satisfactory on quality and schedule delivery.

– To celebrate Segame 22 company has directly participated in construction leveling sports stadium My Dinh.

– Appointed to execute the package No. 1 Highway 2 paragraphs – Hung Temple in Phu Tho province worth nearly 20 billion, construction of Vietnam Nguyen Tat Thanh Tri Phase 1; Phase 2, Phase 3, Bach Hac tourist route – Ben Got, Hung Temple Road – Highway 2 go down 5 Temple Well …. Welcome Seagame 22 in Phu Tho Province. Chairman of the provincial People’s Committeeis  presented certificates of merit for Company.

– Continuing construction of the national traffic in the direction toward the Son La hydropower. The company has been awarded from LICOGI Corporation 11km road to Son La hydropower worth over 32 billion. In this work the company has invested asphalt plant, synchronous machine modern carpet strips of the Federal Republic of Germany to ensure completion of the project schedule.

– Paticapting in partnership LICOGI – CENCO 4 to upgrading Highway 1A Hai Van – Quang Ngai, LICOGI 14 continues to undertake on 40 thousand tons of coarse and fine-grained carpet; Tam Ky avoid flooded sections – Quang Ngai, extremely difficult road to ensure traffic because with a lot of motorcycles, construction and seasonal, international standards, monitoring of foreign consultants. Unit has overcome difficulties to complete their assigned tasks.

All construction works on traffic in all parts of the country as well as Phu Tho province has kept LICOGI 14 prestigious brands with the investor; works are to ensure the quality, progress and economic efficiency.
Regarding civil construction, industrial and irrigation The company was awarded for multiple works, a working office, medical center, schools, canals, dams, irrigation, pumping stations … works make quality, engineering, fine arts, such as Tibet An irrigation dam Luc Yen, Yen Bai.

xem thêm
1982

Period 1982 - 1992

On 11/02/1982, Enterprise of mechanical construction No 14 was established with the head quarter in Tang Loong – Bao Thang – Lao Cai.

In Feb 1982, Enterprise of mechanical construction No 14 was established with the head quarter in Tang Loong – Bao Thang – Lao Cai hereby that Party and Gorvernment with the sponsors from Soviet brother filtration plant construction recruitment Lao Cai apatite. With the main task of leveling construction excavation works, making the background for road, rail and other appurtenances of Lao Cai Apatite plants. Workforce and equipment are transferred from construction sites, factories belonging to the Union of mechanical construction enterprises (now the Corporation for construction and infrastructure development-LICOGI). With the heroic spirit of those who went to build key economic projects of the country, passed hundreds, thousands of kilometers, ramps, winding, deep pools of works. The early days in the land of Tang Long, Bao Thang, Lao Cai is extremely arduous. To reach the construction site must pass dozens kilometer trail, climb hills, wading streams can not speak of all the difficulties, difficulties of the first day set foot on the works. Malaria, water falls, intestinal diseases, diseases of the border war is always a threat to the health and lives of workers and employees due to lack of living conditions, toxic water. Meanwhile all the requirements to serve life, living, serving for production must exceed 600 km of mountainous road transport so difficult, Lu Street Bridge began construction start should have to take a ferry, Red River boat and then walking through nearly 15km on the site.

But the spirit and the will to the nature of mechanized workers, socialist workers have overcome all difficulties and challenges to embark on the construction. People, motorcycles, equipment busiest construction sites and an area lit at night to awaken the potential of the country. Construction just recently built facilities of the unit. From the hills, streams, near 4km2 ground gradually formed, in conditions of poor country, motorcycle equipment primarily used in construction of the Soviet Union. In the early years, though extremely difficult road, but every year, to transport hundreds of tons of equipment and supplies, thousands of tons of fuel to serve in time of construction. Items of plant construction is on schedule, the quality as the foundation plant, silo concentrates, the conveyor, ground station, station ore, the raw ore dam, railway Xuan Giao – ground industrial and mine waste dam, flood discharge culvert, hill transformers … Especially the construction of the dam excavation crude 25,000m2 area and 21m depth in groundwater conditions with heavy traffic and totally rocks . With this category unit focused all major forces include rock drill, excavator, automobile transport, bulldozers and personnel with experience in construction to ensure timely delivery. Average annual construction units from 1.3 to 1.5 million m3 of rock, which kicked from 30 ¸ 40%.

tap-nap-thi-cong

On the construction site, LICOGI 14 always be a leader in every way to ensure the progress of construction, the quality of all items was received  greatly appreciate by experts of the Soviet Union; Party and State were awarded many honors. Wheel scraper Hero team in 1985, first-class Labor Medal, second class, much merit to exercise, individuals with Excellent Achievements in the works.

Also from this work memorable memories, difficulties piled with profound sadness but with the joy of victory in 10 years in Loong- Tang Bao Thang – Lao Cai was imprinted on the memory of bold each personnel until today.

During implementing the key project Lao Cai Apatite, the No. 1 key project of the country’s  Song Da Hoa Binh hydropower , LICOGI 14 continued mobilization  wheel scraper hero team and force equipment, transportation to participate rock drilling and blasting, loading and transport contacts, dam, river bridge from 1986 ¸ 1988 hydroelectricity contribute in the overall progress of the Song Da hydropower.

 

Ngày 11/2/1982 Xí nghiệp thi công cơ giới số 14 được thành lập với – Trụ sở đóng tại Tằng Loỏng – Bảo thắng – Lào Cai!

Tháng 2/1982 Xí nghiệp thi công cơ giới số 14 được thành lập với – Trụ sở đóng tại Tằng Loỏng – Bảo thắng – Lào Cai chính nơi đây Đảng, Nhà nước ta cùng sự giúp đỡ của Liên Xô anh em đã xây dựng nhà máy tuyển lọc quặng APatít Lào Cai. Với nhiệm vụ chính là thi công san nền đào móng các công trình, làm nền đường bộ, đường sắt và các công trình phụ trợ khác của nhà máy tuyển quặng APatít Lào cai. Lực lượng lao động, thiết bị được điều động từ các công trường, xí nghiệp thuộc Liên hiệp các xí nghiệp thi công cơ giới (nay là Tổng công ty xây dựng và phát triển hạ tầng-LICOGI ). Với khí thế hào hùng của những con người đi xây dựng những công trình kinh tế trọng điểm của đất nước, đã vượt qua hàng trăm, hàng ngàn cây số, đường dốc, quanh co, vực sâu về với công trình. Những ngày đầu trên mảnh đất Tằng loỏng, Bảo thắng, Lào Cai vô cùng gian khổ. Để đến được với địa điểm xây dựng công trình phải vượt qua hàng chục km đường mòn, trèo đồi, lội suối không thể nói lên hết những khó khăn, vất vả của những ngày đầu tiên đặt chân lên công trình. Bệnh sốt rét, ngã nước, bệnh đường ruột, các dịch bệnh sau chiến tranh biên giới luôn luôn đe doạ đến sức khoẻ, tính mạng của cán bộ công nhân viên do điều kiện sinh hoạt thiếu thốn, nước độc. Trong khi đó mọi yêu cầu phục vụ đời sống, sinh hoạt, phục vụ cho sản xuất đều phải vượt gần 600 km đường đèo dốc nên phương tiện đi lại khó khăn, cầu Phố Lu bắt đầu khởi công xây dựng nên phải đi phà, đò qua Sông Hồng rồi đi bộ gần 15km vào công trường.

Song với tinh thần và ý chí với bản chất của người công nhân cơ giới, người công nhân XHCN đã vượt qua mọi khó khăn thử thách bắt tay vào xây dựng công trình. Con người, xe máy, thiết bị tấp nập trên công trường và sáng rực một vùng vào ban đêm đánh thức tiềm năng của đất nước. Vừa thi công công trình vừa xây dựng cơ sở vật chất của đơn vị. Từ những quả đồi, khe suối, gần 4km2 mặt bằng dần dần được hình thành, trong điều kiện đất nước còn nghèo, xe máy thiết bị phục vụ thi công chủ yếu của Liên Xô. Trong những năm đầu tuy đường xá vô cùng khó khăn nhưng hàng năm phải vận chuyển hàng trăm tấn thiết bị, vật tư, hàng ngàn tấn nhiên liệu để phục vụ kịp thời thi công. Các hạng mục của nhà máy đều được thi công đúng tiến độ, chất lượng như móng nhà máy chính, Xi lô quặng tinh, nhà băng tải, ga mặt bằng, ga quặng, nhà đập quặng thô, đường sắt Xuân giao – mặt bằng công nghiệp, đập hồ thải quặng, cống xả lũ, đồi biến thế… Đặc biệt là việc thi công đào móng nhà đập thô với diện tích 25.000m2 và chiều sâu 21m trong điều kiện nước ngầm với lưu lượng lớn và hoàn toàn là đá. Với hạng mục này đơn vị đã tập trung toàn bộ lực lượng chủ lực gồm máy khoan đá, máy xúc, ô tô vận chuyển, máy ủi và cán bộ công nhân có kinh nghiệm để thi công đảm bảo đúng tiến độ bàn giao. Bình quân hàng năm đơn vị thi công từ 1,3 đến 1,5 triệu m3 đất đá, trong đó đá chiếm từ 30 ¸ 40%.

Trên công trình LICOGI 14 đã luôn dẫn đầu về mọi mặt thi công đảm bảo tiến độ, chất lượng của tất cả các hạng mục được chuyên gia Liên xô trên công trình đánh giá rất cao; được Đảng và Nhà nước phong tặng nhiều phần thưởng cao quý. Đội cạp bánh lốp Anh hùng năm 1985, Huân chương lao động hạng nhất, hạng nhì, nhiều bằng khen cho tập thể, cá nhân có nhiều thành tích suất sắc trên công trình.

Cũng từ công trình này những kỷ niệm đáng nhớ, những khó khăn chồng chất với nỗi buồn sâu sắc nhưng lại có những niềm vui chiến thắng trong 10 năm ở Tằng Loỏng- Bảo Thắng – Lào Cai đã in sâu đậm nét vào trí nhớ của từng cán bộ công nhân cho tới ngày nay.

 

Trong thời gian trọng điểm của APatít Lào cai thì công trường trọng điểm số 1 của đất nước là thuỷ điện Sông Đà Hoà bình, LICOGI 14 tiếp tục huy động đội cạp bánh lốp anh hùng và lực lượng thiết bị, vận tải lên tham gia thi công khoan đá nổ mìn, bốc xúc vận chuyển, đắp đập, lấp sông thuỷ điện từ 1986 ¸ 1988 góp 1 phần vào tiến độ chung của thuỷ điện Sông Đà.

xem thêm